Skip to content

Berlin’s tram line 21 splits in two for years of construction chaos

A historic tram ride marks the end of an era before years of disruption. Commuters brace for shuttle buses, split routes, and no clear end in sight.

In this image we can see a tram. Inside the tram there are people. In the back we can see vehicles...
In this image we can see a tram. Inside the tram there are people. In the back we can see vehicles on the road. Also there are buildings. In the background there is sky with clouds. Also there is an electric pole with wires. Near to the team there is a railing.

Berlin’s tram line 21 splits in two for years of construction chaos

Berlin's tram line 21 will undergo significant changes from November 22, with the line being temporarily split into two sections for several years. This is due to ongoing construction work on a news today section via Ostkreuz.

From December 14, line 21-North will run between Lichtenberg station and Holteistraße, while 21-South will operate between Marktstraße and Schöneweide. This arrangement will continue until further notice. The news section's construction is planned to begin after the fifth public review of planning documents, with no confirmed completion date yet.

On November 19, the DVN will operate historic rides on Boxhagener Straße using a vintage Tatra T6A2 tram. The following night, November 21–22, will mark the last full-length journey of tram line 21 along Friedrichshain’s Boxhagener Straße. New Jelbi shared-mobility hubs have been set up at the two temporary terminals of line 21.

During the closure between Blockdammweg and Treskowallee from spring to autumn 2026, shuttle buses will run from Bersarinplatz to Hegemeisterweg on Treskowallee. These special trips will depart every 80 minutes between 10:48 AM and 2:48 PM, costing €3 (full fare) or €1.50 (reduced).

The temporary split of tram line 21 is part of the ongoing expansion and improvement of Berlin's public transport network. While the changes may cause some inconvenience, they are necessary for the future development of the city's transport infrastructure.

Read also:

Latest